Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Piping

Application of ring-type joint gaskets in a refinery

SK Energy: Lee, S.  |  Lee, S. H.  |  Jeon, S.
SK Innovation Co. Ltd.: Jang, T. Y.

In refineries and petrochemical plants, ring-type joint (RTJ) flanges have been applied to high-pressure processes or sensitive areas that are susceptible to leaks.

Fabrication of clad equipment and piping—Part 2

Fluor: Shargay, C.  |  Carmona, R. K.  |  Daru, K.  |  Desai, J.  |  Irfan, M.
Reliance Industries Ltd.: Panchal, A.

For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.

Design considerations for rigging and transportation of large process columns

Fluor Daniel India: Sharma, B. K.  |  Bahadur, A.

Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.

Set correct design specifications for optimized piping and pipe support system

Wood Group: Maiti, S.

During the planning and engineering execution of petrochemical, oil and gas, and power projects, it is essential that the owner and engineering, procurement and construction (EPC) contractor mutually develop a comprehensive and detailed piping design specification.

Engineering Case Histories: Case 105—Temperature distribution along a flare line

Consulting Engineer: Sofronas, A.

During an engineer’s career, many interesting questions come up that may not have a ready or good answer.

Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?

Fluor: Kister, H.  |  Van Doorn, E.

A reboiler provides the necessary heat duty for the separation in a distillation tower.

Allocate new plant focus to steam system design—Part 2

TLV Corporation: Risko, J. R.

Part 1 of this article, which appeared in the January 2019 issue of Hydrocarbon Processing, discussed how new plant construction includes expectations for optimized production performance to achieve targeted profitability.

Fabrication of clad equipment and piping—Part 1

Reliance Industries Ltd.: Panchal, A.
Fluor: Carmona, R. K.  |  Daru, K.  |  Desai, J.  |  Irfan, M.  |  Shargay, C.

For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.

Conceptualizing a mega-integrated refinery and petrochemical complex: A case study

Fluor Daniel India Pvt. Ltd.: Chaudhuri, S.  |  Dass, T.

<i>Integration</i> is the new keyword for sustainability and profit in today’s oil and gas market scenario.

Refining—The evolving base oil industry: The Group 1 shift

ExxonMobil: Walko, T.

In April, ExxonMobil launched its 2018 Basestocks Industry Pulse Report. Supported by survey responses from 300 base oil decision makers around the world, the report reveals their own perspectives into the key market trends and industry drivers in the base oils business.