Piping
Develop reactor internals for optimizing reactor design - Part 2: High-performance mixing chamber
Most hydroprocessing reactors are fixed-bed reactors comprising several catalyst beds that are divided by quench zones containing mixing chambers that introduce a vapor-quenching medium.
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
Fluid Flow: Retrofit for reliability with Coriolis flowmeters
Aging infrastructure has become a much-talked-about issue across the hydrocarbon industry.
Application of ring-type joint gaskets in a refinery
In refineries and petrochemical plants, ring-type joint (RTJ) flanges have been applied to high-pressure processes or sensitive areas that are susceptible to leaks.
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
Design considerations for rigging and transportation of large process columns
Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.
Set correct design specifications for optimized piping and pipe support system
During the planning and engineering execution of petrochemical, oil and gas, and power projects, it is essential that the owner and engineering, procurement and construction (EPC) contractor mutually develop a comprehensive and detailed piping design specification.
Engineering Case Histories: Case 105—Temperature distribution along a flare line
During an engineer’s career, many interesting questions come up that may not have a ready or good answer.
Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?
A reboiler provides the necessary heat duty for the separation in a distillation tower.
Allocate new plant focus to steam system design—Part 2
Part 1 of this article, which appeared in the January 2019 issue of Hydrocarbon Processing, discussed how new plant construction includes expectations for optimized production performance to achieve targeted profitability.
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21