Al-Sanad, A.
Abdullmajeed Al-Sanad is a Process Engineer at Saudi Aramco. He works with the Process and Control Systems Department within the Flare and Relief Systems Group. He has 8 yr of experience. Al-Sanad has been involved in major tasks at the company, such as NGL recovery plant commissioning and Saudi Aramco’s decarbonization strategy development. He has also led several milestones in the company’s flaring minimization programs. He earned a BS degree in chemical engineering from King Fahd University of Petroleum and Minerals (KFUPM).
Direction of cost-effective carbon capture and storage technologies
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Refining
/ Carbon Management
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Management
/ Piping
/ Middle East
Around the world, many nations and companies are transitioning toward the decarbonization of energy.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Bio-based aromatics give pathway to drop-in 100% SAF 12/4
- Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection 12/4
- Suez Canal and Scatec sign $1.1-B green methanol MoU 12/4
- Kuwait's al-Zour refinery now fully operational 12/4
- Petroecuador says crude oil output surpasses 400,000 bpd 12/4
- Russia's seaborne diesel exports rose in November with the ban lifted and increased production 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction