White, J.
Evaluate pressure relief system forces in existing installations
The purpose of this study is to limit the number of relief valves that require rigorous engineering calculations to determine the adequacy of the installation.
Ensuring safe operations when fulfilling action item requirements
Consider implementing this criteria to accurately document the process
Accurately predict radiation from flare stacks
Using this technique can take the guess work out of design calculations and improve costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Guiding a chopper valve application 11/30
- Certification of the recyclability of multilayer films containing polyamide expanded 11/30
- Net-zero chemicals industry initiative relaunches as the Global Impact Coalition 11/30
- Topsoe and Standard Gas sign MoU to collaborate on UK-based renewable natural gas and methanol project 11/30
- Virent and Johnson Matthey's SAF breakthrough powers Virgin Atlantic's historic 100% sustainable transatlantic flight 11/29
- EY partners with Aspen Technology to enhance clients’ sustainability, streamline manufacturing, and modernize utility grids 11/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction