White, J.
Evaluate pressure relief system forces in existing installations
The purpose of this study is to limit the number of relief valves that require rigorous engineering calculations to determine the adequacy of the installation.
Ensuring safe operations when fulfilling action item requirements
Consider implementing this criteria to accurately document the process
Accurately predict radiation from flare stacks
Using this technique can take the guess work out of design calculations and improve costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Ningbo Refining & Chemical awards ECI a technology licensing contract for an EVA/LDPE plant in China 4/30
- Fitesa to use Braskem's I'm green bio-based polyethylene grade for nonwovens 4/30
- SIBUR preparing to produce heat-resistant polyethylene in Kazan 4/30
- Aemetis to benefit from the U.S. EPA’s approval of 15% ethanol blend 4/30
- Biofuel maker Neste expects limited impact from tariffs, but supply glut still weighs 4/30
- Portugal's Galp restarting Sines oil refinery over coming days 4/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction