Safety
Power: Temporary power tips for turnarounds and maintenance activities
Maintenance activities and turnarounds often prove challenging to a facility’s electrical power system.
Executive Viewpoint: A vision for the refinery of 2030
The refining business needs to change dramatically over the next decade.
Editorial Comment: Sustainability: The latest creation in advancing ideas
Over the past few months, Hydrocarbon Processing’s editorial staff has traveled thousands of miles to attend numerous conferences, events, users’ groups, groundbreakings, etc.
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Digital: Cloud-based dynamic simulation models amplify operator training and safety programs
International oil and gas (O&G) and hydrocarbon processing industry (HPI) companies are under great pressure to be profitable.
Engineering Case Histories: Case 106: Delayed fireball type explosions
When a vessel containing a flammable liquid under pressure (such as those in an LNG road tanker truck) ruptures and ignites, a vapor fireball explosion can occur.
Reliability: Safe fluid machines are our responsibility
Early in our training as engineers, we developed the ability to collect and evaluate data.
Editorial Comment: Where some see roadblocks, we see opportunities
In the January issue of Hydrocarbon Processing, the editorial comment focused on the roadmap to advancing ideas.
A cost-effective approach to monitoring dangerous hydrogen sulfide gas
Hydrogen sulfide gas (H2S) is one of the most common hazards in the oil and gas industry.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- Air Canada and Airbus launch joint initiative to scale domestic Canadian SAF 8/3
- Purdue Biofuels Consortium to bring biodiesel and ethanol blends to diesel engines 8/3
- Convertus closes on $135-MM financing for flagship biofuel facility in Ontario, Canada 8/3
- New process turns mixed plastic waste into hydrogen fuel without sorting 8/3
- Amogy and 2G Energy successfully demonstrate integrated ammonia-to-power generation with natural gas multi-fuel capability 8/3
- India's Essar Group plans $5.8 B energy transition investment in UK 8/3

