Refining
Innovations
Engineers tasked with finding a green solution to waste gas emissions from hydrocarbon storage tanks during loading and unloading operations will find that the ST100 series thermal flowmeter from Fluid Components International (FCI) supports tank vapor recovery systems, which help reduce greenhouse gas emissions.
Industry Metrics
In the US, soaring gasoline stocks and poor fuel oil performance were offset by strong heating oil demand and higher product prices caused by weather-related refinery outages.
Industry Perspectives: What are the opportunities for the global HPI?
In the February issue of <i>Hydrocarbon Processing,</i> our editors provided the results of <i>Hydrocarbon Processing’s</i> survey on the challenges that the downstream processing industry may face this year.
Digital: Digitalization—Why now?
The process industries are under threat.
Executive Viewpoint: Introducing the refinery of the future
Businesses that develop and commercialize process technology are in a unique position to identify and evaluate global trends in our industry.
Project Management: Intelligent 3D model for digital project execution
Digital transformation offers the chance to reorganize and develop new models of collaboration that fully leverage the opportunities offered by digital technologies and their benefits across the oil and gas business—particularly for original equipment manufacturers (OEMs) and engineering, procurement and construction (EPC) contractors.
The critical maintenance team: Do you have one?
Larger plants typically have planners and maintenance supervisors onsite, as well as operations personnel.
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
The top three causes of contractor and engineering misalignment
When contractors, engineers and operations teams at downstream processing plants do not work together at optimal efficiency, it can present serious problems.
Set correct design specifications for optimized piping and pipe support system
During the planning and engineering execution of petrochemical, oil and gas, and power projects, it is essential that the owner and engineering, procurement and construction (EPC) contractor mutually develop a comprehensive and detailed piping design specification.
- Ebara Elliott Energy awarded landmark order from Kawasaki Heavy Industries to advance global liquefied hydrogen supply chain 4/24
- Digital Exclusive: Early collaboration with vendors: Mitigating design risk and ensuring successful project execution 4/24
- Pacífico Mexinol celebrates groundbreaking of $3.3-B clean fuels complex 4/24
- Brazil to start tests for diesel blend containing 20% biofuel in May 4/24
- ATOME announces FID for $665-MM green hydrogen project in Paraguay 4/24
- U.S.: Trump grants 90-day Jones Act waiver extension to curb energy costs 4/24

