Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Azerbaijan's State Oil Company redirects supplies of jet fuel from STAR refinery to Turkish domestic market 5/8
- Hungry to sell, UAE slips hidden oil tankers through Strait of Hormuz 5/8
- Seven markets to track if peace breaks out in the Middle East 5/8
- Asia exports of refined fuels plunge amid Hormuz closure 5/8
- Libya's Zawiya oil refinery shut due to nearby clashes 5/8
- Meghna PVC partners with Jotun to manage corrosion maintenance 5/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

