Environment & Safety
Update: bp's Olympic Pipeline shutdown hits airlines' fuel supply
The leak was first reported on November 11. bp restored one of the two pipelines east of Everett that had been shut to determine the source of some product discharge. The restored line was shut down again shortly afterward, halting refined product deliveries on the system.
Update: bp crew excavates Olympic Pipeline, yet to find cause of leak
bp said on Friday its Olympic Pipeline crew excavated more than 100 ft (0.03 km) of pipeline following a leak earlier this month near Everett, Washington (U.S.), but have not yet identified the source of the leak.
Update: Fire extinguished at Venezuelan oil upgrader, operations halted
Incidents and outages are frequent within PDVSA's aging infrastructure, including oilfields, refineries and upgraders that are key to turning the country's extra heavy oil output into exportable crude grades.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- HIF Global and German eFuel One GmbH sign HoA for e-methanol offtake 2/20
- Venezuela's refineries boost processing to 35% of capacity 2/20
- New Trinidad gas projects could provide necessary feedstock for country's petchem and LNG sectors 2/20
- MK-Polymer delivers ethylene-propylene rubber to JSC Kazenergokabel 2/20
- Mexican authorities shut down 22-m long tunnel used in illegal smuggling of fuel supplies 2/20
- Digital Feature: First-stage ejector nozzle retrofit achieves meaningful performance improvement 2/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

