Sensors
Digital Exclusive—Endress+Hauser: Driving sustainable transformation together
Analyzers
/ Carbon Management
/ Digital Technologies
/ Environment
/ Equipment
/ Gas Processing/LNG
/ Information Systems
/ Loss Prevention
/ Natural Gas
/ Petrochemicals
/ Process Optimization
/ Refining
/ Sensors
Hydrocarbon Processing had the opportunity to speak with Endress+Hauser CEO Dr. Peter Selders to discuss the latest trends and the company’s approach to present and future challenges across the various industries it serves.
ABB expands non-invasive sensing portfolio to advance simpler, safer temperature measurement
NINVA clamps directly onto the outside of the pipe, giving plant operators accurate process temperature readings without the need to cut, weld or maintain traditional invasive thermowells.
LyondellBasell optimizes refinery middle distillates production across multiple units with dynamic optimization application
Automation
/ Crude oil
/ Diesel
/ Digital Technologies
/ Distillation
/ Distributed Control System
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Natural Gas
/ Petrochemicals
/ Polymers
/ Process Control
/ Process Optimization
/ Products
/ Project Management
/ Reactors
/ Refining
/ Sensors
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Anton Paar launches Autosorb 3300: An advanced flow chemisorption analysis for catalyst characterization 7/31
- China's MIIT recognizes DODGEN melt crystallization technology for 72% energy reduction in ethylene carbonate purification 7/31
- Lydian secure $43 MM Series A funding to deliver cost-competitive SAF at commercial scale 7/31
- PureField launches 150,000-tpy CCS facility in Kansas (U.S.) 7/31
- ADM to expand North America crush capacity amid strong biofuels demand 7/31
- U.S. refiner Valero says tax credit overhaul, registration hurdles have slowed biofuel imports 7/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

