Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Refining

CB&I wins FEED work from Gazprom to develop new Russian refinery

CB&I's project scope includes FEED development for multiple new process units, including a 2 million tpy hydrocracker unit licensed by Chevron Lummus, as well as hydrogen, sulfur and other associated units.

Amec awarded services pact for Kuwait refineries

Amec will be responsible for a range of engineering and management services including feasibility studies, front end engineering design, project management consultancy services and training of Kuwaiti engineers.

Amyris, Total form alliance on renewable fuels

Amyris and Total have formed Total Amyris BioSolutions, a 50-50 joint venture that now holds rights and a license to produce and market renewable diesel and jet fuel from Amyris's renewable farnesene.

Foster Wheeler wins engineering deal in Chile for new molybdenum refinery

Foster Wheeler will undertake detailed engineering and provide procurement assistance and field engineering services for the new refinery, which is planned to process and refine 16,000 tpy of molybdenum feedstock and yield molybdenum as well as copper, rhenium and sulfuric acid.

Honeywell to automate, provide FEED work on new mega-refinery in Kuwait

With a planned capacity of 615,000 bpd, the new Al Zour refining complex being built in southern Kuwait will be Kuwait’s fourth refinery and the largest refinery in the entire Middle East.

Optimize relief loads with dynamic simulation

CPECC East China Design Branch: Xie, C. L.  |  Wang, Z. G.
SimTech Beijing Ltd.: Qin, Y. F.

Pressure relief analysis is a critical task at the engineering design stage of a grassroots oil refinery project. Relief loads must be determined so that the process units and plant flare systems can be designed.

Top HPI Projects

Hydrocarbon Processing Staff: Romanow, Stephany  |  Thinnes, Billy  |  DuBose, Ben  |  Blume, Adrienne

Construction of HPI projects involves numerous risks for several parties. The design and construction of such complexes can take years, from project announcement to commissioning of the complexes. The..

Mitigate fouling in crude unit overhead—Part 3

CH2M Hill: Sloley, A. W.

CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..

HP Editorial Comment: By the numbers

Hydrocarbon Processing Staff: Romanow, Stephany

At times, engineers, bankers, scientists and accountants can be obsessed with numbers. Why? Because numbers are vital, especially in the design and operation of process units and equipment. Anniversar..

HP Brief

Hydrocarbon Processing Staff: Thinnes, Billy

After a bitter labor battle, INEOS Grangemouth reopensINEOS Grangemouth (UK) has reopened its petrochemicals plant and oil refinery in Scotland. The reopening comes after negotiations with the employe..