Process Optimization
Fluor reports record backlog of orders, sees new Q1 projects nearly double from 2010
Fluor reported a record backlog of orders on Friday, saying that new project awards in the company’s first quarter nearly doubled year-earlier levels. The US-based contractor noted the growth in orders as part of its first-quarter earnings, which saw profit climb 2.3% to $140mn amid strength in the company’s industrial and infrastructure business.
Total completes deep conversion at Port Arthur refinery, new units on-stream
Total on Thursday announced the completion of a three-year, $2.2 billion expansion of its Port Arthur refinery, with all new units successfully started and on-stream.
Technip awarded engineering contract for Australia gas complex
Technip was awarded a reimbursable contract for engineering work and services related to procurement and construction management for the Macedon gas project located near Onslow in northwest Australia.
Construction markets show promise, poised for second-half recovery – Foster Wheeler
Global engineering and construction (E&C) markets are showing signs of strengthening, with industry revenues likely to rise in the second half of 2011, the interim chief executive of contractor Foster Wheeler said on Tuesday.
Technip awarded €100mn EPC contract for Canada oil sands project
France-based Technip said it has been awarded an engineering, procurement and construction (EPC) support contract worth approximately €100mn for the Horizon oil sands project in Fort McMurray, Canada.
Siemens wins supply contracts for topside solutions on FPSO project in Brazil
Siemens Energy has been awarded several contracts for the supply of topside solutions including power generation, water injection and power distribution packages for a Brazilian FPSO (floating, production, storage and offloading) project.
LyondellBasell likely to raise US ethylene capacity, may build new cracker - CEO
Global petrochemicals major LyondellBasell is likely to raise its ethylene capacity at two US sites and is considering building a new cracker, CEO Jim Gallogly said on Monday.
Deferred maintenance causes upsurge in pump failures
Not addressing the root cause of a failure puts resources and employees at risk
Avoid costly engineering faults, missteps and miscalculations
Experience does count, especially in achieving success in capital and revamp projects
Nickel recycle: Extending service life for reformer tubes
Case studies investigate methods to conserve high-nickel tubes for fertilizer facilities
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12

