Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Consider new strategies in defining turnaround or construction contracts

Management Controls Inc.: Harrell, B.

As the use of contract labor to complete refinery turnarounds and construction projects is increasing, success of these projects hinges on the ability of owners and contractors to effectively collabor..

Major refinery uses reliable fiscal metering system

Emerson Process Management: Gupta, T.

Reliance Industries Ltd., ranked 99th on the Fortune 500 list of the world’s major corporations, operates the largest refinery and petrochemical complex. Located in Jamnagar, Gujarat, India (Fig...

Improve thermodynamic equilibrium among light olefins in FCC operations

Reliance Industries Ltd.: Jaguste, S. D.  |  Jain, B.

Worldwide propylene demand is strongly increasing. About 28% of the global propylene supply comes from refinery fluid catalytic cracking (FCC) units. The light olefins have relative selectivity due to..

Use adaptive control to improve process operations

AspenTech: Golightly, R.

Refiners and chemical/petrochemical producers can now deploy APC and enjoy sustained benefits by implementing a continuous process for controller maintenance.

HP Editorial Comment: What is the future for hydrocarbons and their prices?

Hydrocarbon Processing Staff: Romanow, Stephany

Have we reached peak oil, again? No; the naysayers have predicted peak oil five times already, and innovative technologies continue to overcome previous barriers and to find new methods of developing ..

HP Reliability: Small deviations can compromise equipment reliability

Hydrocarbon Processing Staff: Bloch, Heinz P.

In 2013, a major refinery was experiencing serious pump problems. The refinery had a massive thrust-bearing failure on a critical 3,560-rpm pump. The pump was designed and manufactured by a well-known..

HP Project Management: Better strategies avoid project delays—Part 1

Tecnicas Reunidas: Corrales-Pérez, J.

Even when using 3D CAD, advanced project management systems and fast-track concepts, projects now take longer than they did two decades ago. Schedule overruns occur as frequently, despite the applicat..

HP Petrochemicals: Coal re-emerges as a primary petrochemical feedstock

Nexant Consulting: Velson, J.

Coal-to-chemicals routes are now an important and viable option for producers in China and beyond. Those that look upon them as atavistic dinosaurs do so at their peril.

HP Engineering Case Histories: Case 78: Writing concisely is a definite work skill

Consulting Engineer: Sofronas, A.

How is it possible to collect and condense so much technical information onto a single page? Answer: It is not by chance. Getting through long speeches or tedious articles are not enjoyable experience..

HP Boxscore Construction Analysis: 2014 global construction outlook—Part 2

Hydrocarbon Processing Staff: Nichols, Lee

According to Hydrocarbon Processing’s HPI Market Data 2014, total capital spending is estimated to exceed $77 B. Part 2 of this outlook examines notable construction activities in Africa, Europe, Latin America and the Middle East.