Process Optimization
Strategic assessment of the Iranian petrochemical industry
The recent agreement between Iran and the international community represents clear opportunities and challenges for petrochemical producers.
Calculate thermal growth of a fractionation tower for piping engineering
The fractionation tower/column is common processing equipment in the petroleum refinery and chemical industry.
In-depth and preemptive front-end planning yields positive project results
Despite the challenges that major projects can present (short deadlines, budget constraints and overruns, unforeseen problems onsite and tension throughout executive teams), they can also prove to be a win-win for both the owner and the engineering, procurement and construction (EPC) firm.
Design a pressure safety valve at the centrifugal pump discharge
In most process plants, it is unusual to install a pressure safety valve (PSV) to centrifugal pump and compressor discharge, but some PSVs are needed and are installed to protect the system against miscellaneous scenarios that could create overpressure in the system.
Engineering Practices: How a full-service R&D laboratory can help your company
To survive and stay competitive in the rapidly changing, technology-driven hydrocarbon processing and petrochemical fields, companies must stay ahead of their research and development (R&D) needs.
People
Marathon Petroleum Corp. has named Gary Heminger, the company's president and CEO, to succeed Thomas Usher as chairman of the board, in addition to his current duties.
Colombia’s Ecopetrol seeks $2 billion from CB&I over refinery costs
Ecopetrol has said bad management at CB&I increased spending on the project by $4 billion, or double the original price tag. Ecopetrol filed the suit before the International Chamber of Commerce.
Odebrecht, Petrobras execs accused in Brazil of downstream corruption
Prosecutors accused Odebrecht of paying bribes to win multibillion-dollar contracts with Petrobras as part of a corruption scheme that implicated dozens of politicians and top executives.
G2X Energy contracts Johnson Matthey, Toyo for Lake Charles methanol
Once complete, the G2X facility, known as Big Lake Fuels Methanol Plant, will produce 1.4 MMtpy of commercial-grade methanol. Construction will take three years to complete.
Central American nations beef up import infrastructure, fuel production amid demand shift
   Methanex’s methanol facility in Trinidad.
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12

