Heat Transfer
Stop welding on my valve
Bolt-on jacketing works in 95% of jacketed applications and eliminates risk of failure
Lower heat exchanger maintenance costs
Failure analysis was used to predict replacement times, saving millions of dollars per year
Are you receiving the best value from your chemical water-treatment supplier?
These three categories of service can help you evaluate your chemical-treatment suppliers’ performance
Optimize energy efficiency of HRSG
With a better understanding of temperature profiles, plant engineers can increase steam production and minimize losses
Balance hydrogen consumption
Atomic, molar and energy-based models can improve refinery operation
Enhance air-cooled heat exchanger performance
Here are ways to improve heat transfer for ACHEs
Consider cryogenic methods to improve ammonia production
New technologies
Temperature cross-based criterion for multipass heat exchanger design
A simple equation and graphic procedure give better results
Compact condensing: new technology improves on traditional approach
Benefits include higher efficiency and lower capital and installation costs
Optimize reboiler design
Use these guidelines for best performance
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kazakhstan to build a new $10-B, 10-MMtpy refinery 2/18
- U.S. EPA expected to send 2026 biofuel blending quotas to White House this week 2/18
- Kent awarded pre-FEED contract for Eq.flight, an advanced power-to-liquids SAF project 2/18
- ABB launches integrated carbon capture measurement solution to accelerate industrial decarbonization 2/18
- CONSER awarded technology licensing/PDP contract for DMS and BDO plant in China 2/18
- Singapore marine fuel sales maintain strong start in early 2026 2/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

