Heat Transfer
Consider cryogenic methods to improve ammonia production
New technologies
Temperature cross-based criterion for multipass heat exchanger design
A simple equation and graphic procedure give better results
Compact condensing: new technology improves on traditional approach
Benefits include higher efficiency and lower capital and installation costs
Optimize reboiler design
Use these guidelines for best performance
Superheaters: design and performance
Understand these factors to improve operation
Is ultrasound leak detection reliable for steam traps?
Know the conditions that invalidate reliability of this method
Guidelines help energy engineers and managers
Here are new guidelines, checklists and an integrated approach for a successful energy conservation program
Consider outsourcing energy supplies
Users can avoid capital expenditures and save on steam and electricity costs
Hydrogen—what are the costs?
HPI operating facilities have many choices on how to meet their rising demand for H2; here are several options
Improve condensate recovery systems
Using these fundamental design guidelines, plant engineers can improve the operation and reliability of steam distribution systems
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

