Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Corrosion

What is new in API 610 11th Ed. (ISO 13709 2nd Ed.)?

Flowserve Corp.: Korkowski, F.
Consultant: Jones, R. L.

Updates to global specifications address pump reliability and much more

Mitigate fouling in ebullated-bed hydrocrackers

Neste Engineering Solutions: Kunnas, J.
Baker Hughes: Ovaskainen, O.  |  Respini, M.

New monitoring tools help track and control asphaltene levels and solubility issues in resid products

Cost optimization in mechanical seal applications

Reliance Engineers Associates Ltd.: Chaware, D. K.  |  Shukla, D. K.  |  Swamy, R. B.

Real-life case studies prove it is possible to make more informed choices that often lead to cost savings

Conduit body features double coating

The newly designed OCAL-BLUE Type 4X Form 8 conduit bodies from Thomas & Betts offer double-coated exteriors for enhanced protection in corrosive environments, as well as extending the service life of the conduit bodies.

Mitigate corrosion in your crude unit

Nalco Company, Energy Services Division: Hilton, N. P.

Real-time analyzers can provide improved monitoring of chloride levels and enable better corrosion control practices

Calculating the temperature distribution in horizontal vessel saddle supports

The heat-transfer theory of cooling fins is applied

Spiral-wound or kammprofile gaskets?

Chevron Richmond Refinery: Reeves, D. W.
Garlock Sealing Technologies: Yoder, C.

There appears to be a shift toward the latter, but the choice isn’t always clear. Here’s where best to apply each type.

HP Reliability: Eccentric reducers and straight runs of pipe at pump suction

Hydrocarbon Processing Staff: Bloch, Heinz P.

Questions relating to proper reducer application in centrifugal pump suction lines date back many decades. Until his death (at age 84, in 1995), world-renowned pump expert Igor Karassik frequently cor..

HP Reliability: Not ready for 29-year-old pump packing

Hydrocarbon Processing Staff: Bloch, Heinz P.

In 2009 we were informed about “a nuclear plant that was never commissioned after its original construction. This plant has been sitting idle for 29 years and is only now starting up.” The o..

Iron sulfides-effect on amine plants

Amine Experts Inc.: Sheilan, M.
Sulphur Experts: Spooner, B.

Amine plants treating gas containing H2S will have iron sulfides in the system. Here's where they help and hinder plant operation