Siemens to supply new compressor trains for three LNG plants in China
The compressor trains in the three plants each consists of a six-stage vertically-split compressor and a Siemens constant speed electric motor. This type of drive and control, using inlet guide vane assemblies, provides more efficient and reliable operation than conventional compressor solutions.
Optimize your compressor maintenance program
One deviation alone might not be enough to bring on a compressor failure, but, when several more deviations combine, the failure risk is known to increase exponentially.
Digital is the solution for modern compressor protection
Compared to traditional analog communications technologies, digital systems cost less, offer greater flexibility, and are more reliable thanks to built-in self-checking systems and resistance to interference.
Case history: Failure analysis of a syngas compressor
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
HP Reliability: Four-stage, low-flow process centrifugal compressor can fill important industry gaps
In the 1970s and 1980s, multistage centrifugal compressors in the 3,000 acfm (about 5,000m3/hr) and lower flow ranges were largely confined to instrument and plant air duties. Three stages with interc..
HP Engineering Case Histories: Case 74: How to determine impact forces when troubleshooting
When troubleshooting failures, it is not unusual for the metallurgical report to indicate that the failure was the result of an impact type of force. The investigator who receives this information mus..
Chevron expands North American compressor oils
Chevron said that Cetus PAO and the rebranded Cetus HiPerSYN (formerly HiPerSYN) have joined Cetus DE to create a family of premium compressor oils formulated for use in a wide range of applications, including portable and stationary rotary screw, rotary vane, and reciprocating compressors.
HP Reliability: Expect adversity, but plan for success
Consider that a major oil refinery was planning a substantial modernization project in 2008. Energy efficiency gains and the ability to process a more readily available crude slate were key motivating..
HP Engineering Case Histories: Case 73: Useful troubleshooting tools to keep at hand
Over the past 45 years, the author has pursued troubleshooting machinery and pressure vessels. It has also been the subject of this column. The troubleshooting tools used in this endeavor have been an..
HP Innovations
Training simulator to aid ethylene operatorsHyperion Systems Engineering has delivered to the Linde Group an operator training simulator (OTS) for ONGC Petro-additions Ltd.’s ethylene plant in Da..
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12