Xu, Q.
Consider novel CGC and front-end depropanizer system for olefins production
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Compressors
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Naphtha
/ Polymers
/ Reactors
In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.
Operational optimization for mixed-refrigerant systems
Use rigorous simulation to improve process efficiency
Fine-tune ethylene unit startups
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Engineering & Design
/ Europe
/ Middle East
/ Rotating Equipment
Advanced modeling methods provide useful information on operating main compressor system and feeds
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indonesia's Pertamina starts carbon injection tests in Sukowati oil and gas field 12/8
- Australia's Woodside, Santos in talks for $53-B oil-gas merger 12/8
- India’s Russian oil imports seen rising on lower prices 12/8
- Nigeria's Dangote refinery receives first crude cargo 12/8
- Details of Canada's planned regulations to limit oil and gas emissions 12/8
- INEOS announces the acquisition of the LyondellBasell ethylene oxide & derivatives business and production facility at Bayport, Texas (U.S.) for $700 MM 12/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction