Americas
Investment roadmap: Planning for carbon capture and storage
Reducing emissions can be approached with a similar method to any other new capital project
Knowledge transfer: A primer for major capital projects
Improve transfer strategy across the project supply chain to achieve smooth end-user takeover
Manage risks with dividing-wall column installations
A simple auxiliary configuration and an extensive modeling study can mitigate the implementation risks of DWCs
Preserving knowledge: Keys to effective lifecycle management
Plant information resides in many locations throughout the facility; capturing it is a challenge
HPI Market Data 2012 Executive Summary
THE NEXT STEPThe economic recovery continues for the global hydrocarbon processing industry (HPI). Energy drives economic growth. Unfortunately for developed nations, stronger economic recovery remain..
Consider these guides for stress relieving of vertical towers
This case history investigates all required post-weld heat treatment for an existing column
HP Reliability: Spare parts availability and the need for non-OEM options
Reliability engineers and their associated job functions often try hard to make their responsible supply-chain staff or purchasing departments understand that it is impossible for the maintenance depa..
HP Integration Strategies: Asset-intensive organizations require good asset information management
ARC Advisory Group has written extensively on the important topic of asset information management (AIM). While numerous cultural and organizational issues come into play, technology clearly provides t..
HP Automation Safety: Safety equipment qualification
During a functional safety assessment of a packaged equipment manufacturer, the issue of instrumentation equipment qualification came up on the audit checklist. The IEC 61511 standard requires that al..
HP Construction: North America
Alfa Laval has an order to supply newly developed equipment for cleaning industrial wastewater in Canada. The order value is approximately SEK 60 million and delivery is scheduled for 2012.The order f..
- Ebara Elliott Energy awarded landmark order from Kawasaki Heavy Industries to advance global liquefied hydrogen supply chain 4/24
- Digital Exclusive: Early collaboration with vendors: Mitigating design risk and ensuring successful project execution 4/24
- Pacífico Mexinol celebrates groundbreaking of $3.3-B clean fuels complex 4/24
- Brazil to start tests for diesel blend containing 20% biofuel in May 4/24
- ATOME announces FID for $665-MM green hydrogen project in Paraguay 4/24
- U.S.: Trump grants 90-day Jones Act waiver extension to curb energy costs 4/24

