Tunca, O.
Ozan Tunca is a Process Engineer, responsible for monitoring, troubleshooting and optimizing Prime G+ and FCC units in Tupras’ Izmit refinery. Previously, he worked as a process safety engineer in the oil and gas and petrochemical industries. He earned a BS degree in chemical engineering from Yildiz Technical University.
Izmit FCCU revamp
Tüpraş utilizes proprietary fluid catalytic cracking units<sup>a</sup> (FCCUs) at its Izmit and Izmir refineries. The Izmit unit was designed in 1968 and started up in 1972 with a side-by-side style reactor/regenerator.
FCC and HDS feed flexibility and integration with the delayed coker in the Izmit refinery
Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrotreating
/ Loss Prevention
/ Naphtha
/ Natural Gas
/ Sulfur
/ Treating
/ Europe
Operational flexibility is one of the key parameters that leads to success and sustainability in refinery production.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction