Sönmez, M.
Mert Sönmez has been working as an FCC Process Engineer at the İzmir refinery for 1 yr. He has a BS degree in chemical engineering from the İzmir Institute of Technology. His role is tracking the key parameters and running the FCCU to optimum conditions.
Feed nozzle effects on yields and operation of FCCUs
Process Optimization
/ Refining
/ Distillation
/ Engineering & Design
/ Equipment
/ Products
/ Reactors
The first-generation, proprietary feed distributorsa had open-pipe bayonets that were located at the base of the wye section/riser.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- RIC Energy and Siemens to jointly develop renewable H2, green ammonia and eFuels 6/2
- Trump administration (U.S.) axes $3.7-B in green energy projects 6/2
- Petroecuador declares emergency at Ecuador's biggest refinery after fire damages 5/30
- U.S. administration considers plan to clear record backlog of small refinery biofuel waivers 5/30
- Sinopec sets up $690-MM hydrogen-energy-focused venture capital fund 5/30
- Wartsila bets flexibility key for ethanol power generation in Brazil 5/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction