Mandal, P. K.
Demystify warm-up practices for centrifugal pumps
Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Loss Prevention
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Pumps
/ Valves
This article provides a thorough analysis of various warm-up practices—examining their benefits and drawbacks and proposing well-grounded guidelines for the development of efficient warm-up systems.
Case history: Troubleshooting a leaking valve in a hydrogen unit
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Pumps
/ Safety
A Middle East refinery installed a hydrogen plant that was designed to produce 20,000 Nm3/hr of pure hydrogen (H2) to support a diesel hydrotreater. The unit was commissioned in 2006. This H2 plant wa..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- KBR to provide technology for mega-scale ammonia plant in Angola 11/25
- Indian refiners' October crude processing up over 3% y/y 11/25
- Air Liquide strengthens partnership with TotalEnergies through renewable H2 project in France 11/25
- Hexagon collaborates with Microsoft to enhance industrial operations 11/25
- China issues extra crude oil import quota to teapot refineries 11/25
- McDermott achieves ISO 50001 Certification for energy management at four fabrication yards 11/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction