Talukder, R.
Rajib Talukder is a Process Specialist in the Global Manufacturing Excellence department at Aramco, Saudi Arabia. He has more than 30 yr of experience in process engineering and earned a BTech degree in chemical engineering from NIT Tiruchirappalli, India.
Demystify warm-up practices for centrifugal pumps
Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Loss Prevention
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Pumps
/ Valves
This article provides a thorough analysis of various warm-up practices—examining their benefits and drawbacks and proposing well-grounded guidelines for the development of efficient warm-up systems.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Yara begins production of renewable-based ammonia in Brazil 12/9
- Two dead, 9 injured, 4 missing in blast at Eni site near Florence 12/9
- Gentari to supply large-scale, carbon-free energy to AMG Ammonia's new green ammonia facility 12/9
- Aramco, TotalEnergies and SIRC assess the development of SAF unit 12/9
- Hycamite, MOLEA and MOL PLUS sign MoU to promote methane-splitting for power generation and marine vessel propulsion 12/9
- California law and refinery closure reflect ongoing challenges for state’s fuel market 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction