Mandal, P. K.
Demystify warm-up practices for centrifugal pumps
Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Loss Prevention
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Pumps
/ Valves
This article provides a thorough analysis of various warm-up practices—examining their benefits and drawbacks and proposing well-grounded guidelines for the development of efficient warm-up systems.
Case history: Troubleshooting a leaking valve in a hydrogen unit
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Pumps
/ Safety
A Middle East refinery installed a hydrogen plant that was designed to produce 20,000 Nm3/hr of pure hydrogen (H2) to support a diesel hydrotreater. The unit was commissioned in 2006. This H2 plant wa..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 teams with NextEra Energy Resources to power Rodeo Renewable Energy Complex with solar facility 12/10
- Global airlines could miss sustainable fuel targets, says IATA 12/10
- INEOS-led Greensand to become first full-scale CO2 storage facility in EU 12/10
- Air Liquide receives EU grant to develop large-scale H2-from-ammonia ENHANCE project 12/10
- Green light for carbon capture and low-carbon power JV projects in Teesside 12/10
- Yara begins production of renewable-based ammonia in Brazil 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction