Mandal, P. K.
Demystify warm-up practices for centrifugal pumps
Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Loss Prevention
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Pumps
/ Valves
This article provides a thorough analysis of various warm-up practices—examining their benefits and drawbacks and proposing well-grounded guidelines for the development of efficient warm-up systems.
Case history: Troubleshooting a leaking valve in a hydrogen unit
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Pumps
/ Safety
A Middle East refinery installed a hydrogen plant that was designed to produce 20,000 Nm3/hr of pure hydrogen (H2) to support a diesel hydrotreater. The unit was commissioned in 2006. This H2 plant wa..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- IHI, Vopak to launch ammonia terminal project in Japan 7/11
- India's BPCL plans to shut Bina refinery unit for 15-day maintenance in August 7/11
- Soaring electric truck sales deal new blow to diesel use in China 7/11
- Russia`s Tatneft launches new hydrocracking unit on TANECO refinery 7/11
- IEA: Global oil market may be tighter than it looks 7/11
- India must boost its petchem output to counter China's dominance, Reliance says 7/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction