Jensen, D. R.
Daryl Jensen joined OGT as a Development Engineer in 2021. He spent the previous 15 yr with Ortloff Engineers (now, Honeywell UOP), during which his responsibilities included process design/development, simulation, basic engineering design pack-age project execution, process control design, and onsite startup/troubleshooting for gas processing and treating technologies, including sulfur recovery (refinery and gas plant), cryogenic NGL/LPG recovery, acid gas treating and sour water stripping. Jensen holds BS and MS degrees in electrical engineering from New Mexico State University and is a registered Professional Engineer in Texas.
Riding the dragon: Sulfur plant thermal reactor temperature measurement
Of all the fundamental measured process variables, temperature is perhaps the most reliable.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Mitsui Chemicals studying use of ethanol to make petrochemicals 5/16
- Lotte Chemical to start operating Indonesia cracker in H2 2025 5/16
- hte, Mitsubishi Chemical partner to screen MMA oxidation catalysts 5/16
- U.S. EPA to rule on backlog of small refinery biofuel exemption requests 5/16
- Some Brazil sugar mills weighing switch to ethanol 5/16
- AFPM honors top refining and petrochemical facilities 5/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction