Bailey, M. D.
Matt Bailey joined Optimized Gas Treating Inc. in business development in 2014, where he provides sales and marketing support. Bailey has 20 yr of industry experience in technical sales, creating safe engineered solutions for refineries, chemical plants and engineering companies. He has additional experience in relief valve studies with hydrocarbon units for Murphy Oil and Motiva. Safety has been a key component in driving his career. Bailey licensed with the Texas Board of Professional Engineers, and holds a BS degree in chemical engineering from Texas A&M University and a MBA from the University of Houston.
Riding the dragon: Sulfur plant thermal reactor temperature measurement
Of all the fundamental measured process variables, temperature is perhaps the most reliable.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Aster Chemicals declares force majeure at Singapore naphtha cracker 8/29
- Orlen signs 1-yr deal with Equinor for supply of 15% oil it uses 8/29
- Novatek partially resumed processing at Ust-Luga complex 8/29
- Phillips 66 to begin winding down Los Angeles-area refinery next week 8/29
- Update: Mexico's Minatitlan refinery back online, Olmeca still down 8/29
- SIBUR produces test batch of first hexane plant in Russia 8/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction