Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Maintenance & Reliability

HP Reliability: Electric motors and mechanical efficiency

Hydrocarbon Processing Staff: Bloch, Heinz P.

Reliability-focused readers know quite a bit about oil mist and many use plantwide oil mist systems for their process pumps and electric motor drivers. In fact, some major grassroots olefins plants us..

Estimate water hammer loads in steam piping

Reliance Refinery: Darji, P.  |  Saha, S.

The problem is more complicated because of the two-phase flow

HP Reliability: Why continuing education gets dropped first

Hydrocarbon Processing Staff: Bloch, Heinz P.

Fact: An oil refinery in the Western US achieves a pump mean-time-between-failure (MTBF) of over nine years. The facility has 1,200 pumps and, in a given year, repairs 130 of them. Fact: An oil refine..

Designing and troubleshooting stabilization plant filtration systems—Part 1

Sarkhoon & Qeshm Gas Treating Company: Atash Jameh, A.  |  Bazargani, S.  |  Zamani Gharaghoosh, A.
Consultant: Mokhatab, S.
Bid Boland II Gas Treatmeant Plant Project: Rahimi, S.

Compatability of the filter cartridge media with the plant feed is a major consideration

HP Reliability: Consider recessed-impeller pumps

Hydrocarbon Processing Staff: Bloch, Heinz P.

Perhaps you have encountered pumping duties handling free-flowing slurries, sludge and fibrous materials. If used in these services, a standard centrifugal pump may clog, become vapor-bound or wear ex..

What's new in vertical enclosed shaft-driven sump pumps

Hydrocarbon Processing Staff: Bloch, Heinz P.
Emile Egger & Cie: Franklin, R.

Advanced designs incorporate axial-spiral design casing internals and fully recessed impellers

Proper gasket removal and replacement can reduce maintenance and increase uptime

Garlock Sealing Technologies: Burgess, D.  |  Hurley, T.

Follow these guidelines for trouble-free performance

Risk-based inspection, panacea for plant failures?

International Inspections Centre W.L.L.: Pullarcot, S. K.

Understand the limitations for an effective implementation

Case 50: Gearbox input shaft failure analysis

Consulting Engineer: Sofronas, A.

Make sure the same failures are not repeated at your affiliated plant sites

Improve cooling tower gear drive reliability

Philadelphia Gear Corp.: DeBaecke, J.

Applying commodity products instead of engineered solutions can cause premature failure