DeBaecke, J.
Understanding and maintaining an effective lubrication system
Follow these guidelines to improve gearing equipment life
Improve cooling tower gear drive reliability
Applying commodity products instead of engineered solutions can cause premature failure
Returning submerged gear drives to temporary service
Follow these guidelines to render the unit operational for a significant period before a rebuild is required
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

