Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Maintenance & Reliability

Optimize cracked-gas compressors with smart-automation technology

Emerson Process Management: Cox, P.

Machine health monitors can provide critical information to avoid unit and plant-wide shutdowns

Accurate feedstock selection and planning are critical to profitability

Honeywell Hi-Spec Solutions: Adams, D. J.
Maruzen Petrochemical: Funahashi, K.  |  Kobayashi, H.
Yamatake: Saiki, K.  |  Suzuki, M.

Linear programming plays a vital role for ethylene producer

Low-pressure absorption of CO2 from flue gas

Politecnico di Milano: Tellini, M.  |  Centola, P.

Case study accomplished 95% sequestration using methyldiethanolamine aqueous solution

Investigation: Failure of a surface condenser titanium tube

Saudi Basic Industries Corp.: Al-Meshari, A.
SABIC Technology Centre: Al-Enazi, S.  |  Diab, M.

Advanced analytic methods determine contributing factors in heat exchanger corrosion problem

HP Reliability: Tutors can provide answers

Hydrocarbon Processing Staff: Bloch, Heinz P.

As you read this column, much additional data on the nuclear disaster on the east coast of Japan’s main island will have become available. But, the terms safety and reliability will still be on o..

ExxonMobil opens Shiogama terminal in area affected by earthquake, tsunami

ExxonMobil Japan Group has reopened its Shiogama terminal, enabling delivery of increased fuel supplies into the Tohoku area of Northeast Japan, which was affected by the March 11 earthquake and tsunami.

Improving pH control mitigates corrosion in crude units

Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections

Avoid brittle fracture in pressure vessels

Chagalesh Consulting Engineers: Khazrai, F.  |  Haghighi, H. B.  |  Kordabadi, H.

Key points identify effects from auto-refrigeration on steel vessels

Flare stack structure revamp: A case history

Reliance Industries Ltd.: Singh, S.

An innovative approach was used to repair an older flare structure online without an extensive shutdown

Case 61: Pressure loss in a reactor

Consulting Engineer: Sofronas, A.

Much information is available from a simple analysis