Engineering & Design
HP Engineering Case Histories: Case 71: Statistical visual data can be useful in troubleshooting—Part 2
In “Case 71: Statistical visual data can be useful in troubleshooting—Part 1,” the editorial focused on how taking data and analyzing it could determine the cause for high reject rates...
HP Brief: Brief
Galveston Bay refineryMarathon Petroleum has closed its transaction with BP to purchase several assets, including the 451,000-bpd refinery located in Texas City, Texas. The refinery will be renamed an..
HP Industry Perspectives: EU leans forward on clean-fuel strategies
In late January 2013, the European Commission (EC) announced ambitious measures to ensure the buildup and standardization of alternative fueling stations across Europe. Much of the earlier EC policy i..
HP Innovations: Innovations
Coating system gets European patentHempel’s Ultra-High Solids and Speed (UHSS), a two-coat protective paint system certified for C5-M and C4 corrosive environments, has been granted a patent from..
Toyo wins deal to build Indonesia ammonia plant
The plant is scheduled to be completed in the third quarter of 2015. The project plans to produce ammonia as a feedstock for downstream chemicals such as fertilizer, acrylonitrile, caprolactam and ammonium nitrate using natural gas produced from the Senoro and Toili gas fields in Central Sulawesi.
QP, Shell award FEED to Fluor for Al-Karaana petrochemicals project
The scope being considered includes a world-scale steam cracker, with feedstock coming from natural gas projects in Qatar; a 1.5 million tpy mono-ethylene glycol plant using Shell’s proprietary OMEGA technology; a 300,000 tpy linear alpha olefins unit; and a 250,000 tpy oxo-alcohols unit.
TPC approves engineering design phase for Texas butadiene expansion
This approval follows the successful completion of the project's preliminary engineering study to produce butadiene from a variety of sources. TPC Group said it anticipates that its engineering design optimization will be complete by the end of the third quarter of 2013.
BASF awards engineering work to Fluor on German toluene diisocyanate plant
The single-train, 300,000 tpy plant will produce TDI and expand additional plants as precursors for polyurethanes at the BASF site in Ludwigshafen. Production is set to begin in the fourth quarter of 2014.
KBR licenses technology to Bolivia ammonia plant
The fertilizer ammonia complex will be designed using KBR’s Purifier technology. KBR will additionally supply proprietary operator training simulators and a steam dynamic simulation study to ensure a safe, fast, efficient startup of the ammonia plant and continued support to the operations.
- Bechtel greenlit for Sabine Pass Liquefaction expansion in Southwest Louisiana (U.S.) 5/29
- Philippines receives rare Iranian crude cargo after wartime disruption 5/29
- Gazprom and Sibur resume talks on possible ethane project to supply additional feedstock to the Kazanorgsintez petrochemicals plant 5/29
- European Commission debates policy shift to protect industry from China 5/29
- Mitsui seeks LNG investments to meet power demand from data centers 5/29
- Kenyan government backs Gulf fuel supply deals after opposition criticism 5/29

