Compressors
How the inertia number points to compressor system design challenges
Maintenance & Reliability
/ Process Optimization
/ Compressors
/ Engineering & Design
/ Rotating Equipment
It facilitates predicting compressor system performance
Case 57: Troubleshooting the cause of sudden impacts
Maintenance & Reliability
/ Compressors
/ Drivers
/ Economics
/ Engineering & Design
/ Motors
/ Piping
/ Pumps
/ Rotating Equipment
/ Safety
Finding the cause can be elusive but calculations help
Burckhardt Compression delivers process gas compressors to hydrogen plant in Rotterdam
A call was placed to Burkhardt Compression that resulted in three new process gas compressors being delivered in April to the plant. The responsible contractor for the project is Air Liquide’s subsidiary Lurgi GmbH.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Lummus and Sumitomo Chemical to collaborate on circular and polyolefins technologies 5/21
- Malaysia to cut diesel subsidies, saving $852 MM/yr 5/21
- Indian refiner Reliance's April Russian oil imports up 11% month-to-month, India's Russian oil imports at 9-month high 5/21
- Global carbon emissions pricing raised record $104 B in 2023 5/21
- Digital Exclusive: Supporting the shipping sector’s decarbonization to a carbon-free future 5/20
- Repsol: Renewable fuels are key to the transformation of the refining industry 5/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction