Targeted liquid injection improves shed deck performance
Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Technip Energies and Anellotech to jointly develop sustainable plastics recycling 4/22
- BHP says it aims to receive first ammonia-fueled bulk carrier in 2026 4/22
- Biofuels refiner Ecoceres expects Malaysia unit to start up in second half 2025 4/22
- Neste successfully concludes its first processing run with pyrolysis oil from discarded tires 4/22
- NextChem advances plastic upcycling with NX Replast technology, boosting the circular economy 4/22
- BASF now offering polyamides for the textile industry according to Recycled Claim Standard 4/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction