Riley, C.
Targeted liquid injection improves shed deck performance
Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Petroecuador declares emergency at Ecuador's biggest refinery after fire damages 5/30
- U.S. administration considers plan to clear record backlog of small refinery biofuel waivers 5/30
- Sinopec sets up $690-MM hydrogen-energy-focused venture capital fund 5/30
- Wartsila bets flexibility key for ethanol power generation in Brazil 5/30
- Lotte Chemical Titan signs contract to buy naphtha from Aramco Trading Singapore 5/30
- India's May diesel exports to Southeast Asia seen at multi-year highs on higher margins 5/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction