Jensen, D. R.
Daryl Jensen joined OGT as a Development Engineer in 2021. He spent the previous 15 yr with Ortloff Engineers (now, Honeywell UOP), during which his responsibilities included process design/development, simulation, basic engineering design pack-age project execution, process control design, and onsite startup/troubleshooting for gas processing and treating technologies, including sulfur recovery (refinery and gas plant), cryogenic NGL/LPG recovery, acid gas treating and sour water stripping. Jensen holds BS and MS degrees in electrical engineering from New Mexico State University and is a registered Professional Engineer in Texas.
Riding the dragon: Sulfur plant thermal reactor temperature measurement
Of all the fundamental measured process variables, temperature is perhaps the most reliable.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Europe's chemical industry seeks a lifeboat to stay in business 7/21
- BlackRock-led group set to invest in $10 billion Aramco Jafurah infrastructure deal 7/21
- Yara announces possible new ammonia projects in the U.S. 7/21
- German chemical lobby VCI sees no sector recovery before 2026 7/21
- India's Numaligarh Refinery extends key green hydrogen tender date amid Assam policy uncertainty 7/21
- Hynfra and JK Srivastava Group to build $4-B green hydrogen and ammonia hub in India 7/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction