Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Shahani, G.

Linde Engineering North America, Inc., Blue Bell, Pennsylvania

Better risk-management methods ensure project success

Linde Engineering North America, Inc.: Shahani, G.  |  Rentschler, C.

Management of project risk is a challenge under normal times, and this crucial activity is exasperated in complex projects as a result of the shale gas revolution.

Successful project development and execution: Beyond EPC to ‘T-EPC’

Linde Engineering North America, Inc.: Shahani, G.  |  Rentschler, C.

North America is in the middle of a petrochemical renaissance due to the shale gas tsunami. While this new development is most prevalent in North America, similar trends are expected to develop in oth..

Improve the cracking of ethylene dichloride

Linde Engineering North America, Inc.: Shahani, G.  |  Ma, D.

The discovery and exploitation of shale gas in North America is providing a boost to the domestic petrochemical industry. In particular, commodity petrochemicals such as polyvinyl chloride (PVC) are e..

Project management: Construction of modern-day hydrogen capacity in the Middle East

Linde Engineering North America, Inc.: Shahani, G.  |  Shahani, S.  |  Crisler, M.  |  Kogan, L.

Refining heavier and high-sulfur crude oils consumes high volumes of hydrogen (H2). Most refineries have exhausted process-based H2 supplies and must use on-purpose sources. This article follows the d..

How to select the ‘best’ fired heater for your operations

Linde Engineering North America, Inc.: Shahani, G.  |  Remster, J.  |  Ma, D.  |  Hashmi, O.

With the fluctuation of natural gas pricing, it is important to evaluate technically feasible solutions and choose the most economical alternative. Ultimately, this leads to a simpler and more cost-effective solution.

Selecting the right steam methane reformer: Can vs. box design

Linde Engineering North America, Inc.: Shahani, G.
Linde Engineering: Schoerner, W.
Hydro-Chem: Musich, N.

Simulating various configurations and cost estimates aids in the selection of a steam methane reformer for hydrogen production

Improve evaluations for your industrial gas needs

Linde Engineering North America, Inc.: Shahani, G.
Linde Engineering: Koehler, R.

Petrochemical and refining complexes are significant consumers of industrial gases; here are some tips in planning process-gas needs

  • 1
  • ... 1 pages