Srinath, N. R.
N. R. Srinath has more than 14 yr of experience in the design and engineering of heat transfer equipment in the energy and chemical sectors. He began his career with Foster Wheeler India in 2007 and has worked at Fluor New Delhi since 2013.
Case study: Challenges in the selection of a helical baffled exchanger
In a greenfield project, a proprietary heat exchanger<sup>a</sup> has been found to be preferable to conventional shell-and-tube (S&T) exchangers to optimize the total lifecycle cost (i.e., capital, operating, installation and maintenance costs).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction