Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages

- Valero Energy beats Q2 profit estimates as refining margins improve 7/24
- SWISS becomes world’s first airline to integrate Synhelion solar fuel into its flight operations 7/24
- Finland's Neste tops earnings forecast on soaring SAF sales 7/24
- Shell restarts hydrodesulphurization unit at Pernis oil refinery after unplanned outage 7/24
- Orlen's Unipetrol will start commissioning ethylene unit after power outage experienced earlier in July 7/24
- Dow forecasts sales below estimates, slashes dividend as downturn takes a toll 7/24