Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages

- Borouge set to boost production capacity to over 6.6 MMtpy 4/28
- Sri Lanka to begin talks with India, UAE for new energy hub 4/28
- S-Oil posts refining, petrochemical losses; expects US tariffs to affect margins in Q2 4/28
- Kuwait Petroleum's stake investment in China Wanhua Chemical's unit valued at $638 MM 4/28
- Chemical maker LyondellBasell misses quarterly profit estimates on weak volumes 4/28
- Trump administration (U.S.) to allow temporary sales of summertime higher-ethanol fuel 4/28