Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
- Eberhard Bau signs long-term solar diesel offtake agreement with Synhelion 2/3
- Abundia Global Impact Group appoints Burns & McDonnell as front-end engineer for waste plastics-to-fuels facility 2/3
- Rutgers University researchers develop catalyst that can convert nitrate pollution in water directly into ammonia 2/3
- Italy's Eni teams up with Q8 to build biorefinery in Sicily 2/3
- French ethanol use jumps 15% in 2025, driven by gasoline demand 2/3
- Indian refiners await government advice on Russian oil import halt 2/3

