Geronimo, G. DI
Giovanni Di Geronimo is a Process Safety Engineer at ExxonMobil’s Rotterdam refinery. He holds a Bch degree in chemical engineering from Universidad Simon Bolivar and an MSc degree in process engineering from Imperial College London.
Coke drum and blowdown system overpressure protection design—Part 2
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Distillation
/ Drivers
/ Engineering & Design
/ Environment
/ Equipment
/ People
/ Products
/ Safety
/ Valves
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 teams with NextEra Energy Resources to power Rodeo Renewable Energy Complex with solar facility 12/10
- Global airlines could miss sustainable fuel targets, says IATA 12/10
- INEOS-led Greensand to become first full-scale CO2 storage facility in EU 12/10
- Air Liquide receives EU grant to develop large-scale H2-from-ammonia ENHANCE project 12/10
- Green light for carbon capture and low-carbon power JV projects in Teesside 12/10
- Yara begins production of renewable-based ammonia in Brazil 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction