Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
- Cognite launches Integrated Supply Chain offering to deliver more business value and operational resilience 6/17
- MyRechemical to license technology for Canadian biomass-to-SAF project 6/17
- Honeywell to provide technology for Acelen Renewable's SAF and renewable fuels facility in Brazil 6/17
- ACME signs investment agreement for $4.2-B green hydrogen/ammonia project in Oman 6/17
- Amogy and KOWA partner to provide ammonia cracking-based hydrogen supply in Japan 6/17
- IEA sees significant 2027 oil surplus after Hormuz recovery 6/17

