Ceary, P. J.
Philip Ceary graduated from the University of Maryland College Park with a BS degree in chemical engineering in May 2002. He works in the field of process design, optimization and logistics, and project development for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design—Part 2
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Distillation
/ Drivers
/ Engineering & Design
/ Environment
/ Equipment
/ People
/ Products
/ Safety
/ Valves
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Hapag-Lloyd concludes long-term offtake agreement for green methanol 12/2
- BASF unveils new HDPE brand Easiplas and HDPE construction milestones at Zhanjiang Verbund site 12/2
- Russia's Rosneft may delay refinery modernization due to high interest rates, taxes 12/2
- Solarig to develop €1.15-B, 75,000-tpy Turboleta SAF in Spain 12/2
- Maersk to use SAF to decarbonize airfreight travel 11/29
- Foundation stone laid for 1.2-MMtpy blue ammonia plant in Qatar 11/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction