Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages

- Transition Industries signs agreements for the Pacifico Mexinol Project, an ultra-low carbon chemical production facility 7/3
- Bangkok Airways introduces SAF on commercial flights 7/3
- EcoCeres secures SAF contract with British Airways to help reduce carbon emissions 7/3
- Air Liquide to invest up to $200 MM in Louisiana, U.S. to support industrial growth 7/3
- MOL completes the acquisition of LBC Tank Terminals 7/3
- BHP awards charter contracts for two ammonia dual-fueled vessels 7/3