Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages

- U.S. oil, biofuel group recommends 5.25 Bgal in biomass diesel mandates 4/11
- Ukraine will add bioethanol to petrol from May, seeks first imports from EU 4/11
- UN shipping agency strikes deal on fuel emissions, CO2 fees 4/11
- S&P analysis: Global refined product demand growth likely to weaken, absolute decline cannot be ruled out 4/11
- U.S. targets China oil storage terminal in new Iran-related sanctions 4/11
- Russia's Novatek plans condensate processing complex in Murmansk 4/11