When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
Maximum throttling of manual valves without damage
Use these graphs to avoid damage to internals and piping
Avoid cavitation in butterfly valves
Use these coefficients to determine safe throttling positions
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- ClassNK releases report ‘ClassNK Alternative Fuels Insight (Version 3.0): Providing new information on cost simulations reflecting approval at MEPC 83 5/22
- trinamiX and BASF showcase new technologies for polyamide 6 recycling: An approach to circularity in the textile industry 5/22
- ADNOC’s suppliers commit to invest AED3 billion in manufacturing facilities across UAE 5/22
- Industrial AI: A game-changer in fast-tracking digital transformation in the energy sector 5/22
- U.S. says there are significant undiscovered oil and gas resources in Wyoming 5/21
- Bureau Veritas grants AiPs for IMODCO’s portfolio of jetty-less solutions for new energies transfers 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction