Li, P.
Ping Li is a Plant and Process Safety Engineer at Covestro and has 6 yr of experience in emergency relief system design and process hazard analysis. Dr. Li earned a BS degree from Shaanxi University of Science and Technology, an MS degree from Tianjin University and a PhD from the University of Pittsburgh.
Use a simple vapor equation for sizing two-phase pressure relief valves
Pressure relief valves (PRVs) protect process equipment from the hazards of excessive over-pressure.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Mitsui Chemicals studying use of ethanol to make petrochemicals 5/16
- Lotte Chemical to start operating Indonesia cracker in H2 2025 5/16
- hte, Mitsubishi Chemical partner to screen MMA oxidation catalysts 5/16
- U.S. EPA to rule on backlog of small refinery biofuel exemption requests 5/16
- Some Brazil sugar mills weighing switch to ethanol 5/16
- AFPM honors top refining and petrochemical facilities 5/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction