Process Optimization
HP Integration Strategies: 3D laser scanning delivers benefits in hydrocarbon processing facilities
Present 3D laser scanning (3DLS) technology can be used in many diverse applications; it assists in improving efficiency and quality, and reducing time-to-benefit. For discrete industries, 3DLS can sa..
HP Water Management: Need a package boiler in a hurry?
Acquiring a package boiler is an unplanned event that requires process engineers to solve this completely unfamiliar problem. To reduce the chaos of replacing them, here are helpful ways to resolve this situation.
HP Brief
Uncertainty looms in EU economyEuropean chemicals output contracted by 2% in 2012 compared with 2011, according to European chemicals group Cefic. By lowering its forecast released in September, the c..
HP Industry Perspectives: 2012: Is it over yet?
According to a year-end report from the American Chemistry Council (ACC), the global economy is still stumbling three years after the “great recession of 2008.” The Euro area is challenged t..
HP Impact: Increased operating costs in the Asia-Pacific region could derail growth
Rising operating costs will be the biggest barrier to oil and gas companies’ growth in Asia-Pacific next year, according to a 2013 outlook for the industry by GL Noble Denton. While the sector..
Cheniere taps Bechtel to engineer LNG expansion at Louisiana export site
Cheniere said it intends to give Bechtel a notice to proceed with construction for the third and fourth liquefaction trains upon achieving acceptable financing arrangements and making a final investment decision. Construction for the third and fourth trains is expected to begin in the first half of 2013.
WorleyParsons wins FEED work for expansion of Singapore LNG terminal
The expansion plans include the installation of additional facilities to increase the terminal’s capacity from its current 6 million tpy throughput to a new annual capacity of 9 million tpy, as well as the construction of a fourth tank. The design will also explore possible future expansions.
CB&I to build Esso Australia gas conditioning plant
CB&I’s work scope includes the engineering, procurement, fabrication, and construction of the Longford gas conditioning plant, which is designed to handle 400 million cubic feet/day of gas from the Kipper, Tuna and Turrum fields in Bass Strait. The deal is worth about $550 million.
BASF taps Technip, Asahi Kasei for expansion work on German chlorine plant
The work will include a membrane chlorine plant expansion as well as the integration and implementation of existing equipment and facilities. Technip will be responsible for the complete EPC execution of the project, using Asahi Kasei Chemicals' technology and proprietary equipment.
KBC inks multi-year consulting, software contract with Ecuador refinery
As part of the contract, EP PETROECUADOR will take a five-year license for KBC's process and energy modelling software tools, including the full Petro-SIM suite, to optimize the operation of the refinery. KBC says it will work with EP to improve its core work processes and support systems.
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15

