Process Optimization
Amec Foster Wheeler to study new Malaysian refining, chemicals project
Under the contract, Amec will undertake a detailed feasibility study to define the configuration of the complex, develop the infrastructure requirements, establish a project implementation plan and produce a cost estimate to optimize the project and establish a clear plan to move forward.
US engineer KBR sells building business to Pernix
The transaction's price with Pernix is $22 million, and KBR expects to record a pre-tax gain of approximately $28 million in its second quarter 2015 financial results.
Industrial Cooling Solutions wins major Malaysia refinery, cracker contract
The concrete, back-to-back counterflow cooling tower will play a critical role in the development of the RAPID refinery by reducing power use while maintaining optimum plant efficiency for maximum output.
Toyo, IKPT to build new Indonesia rubber project
TOYO entered into an offshore supply contract and IKPT entered into the detailed engineering, procurement and construction contract. The target for completion is in 2018.
Use advanced automation and project management to simplify refinery construction
Process automation in oil refineries is undergoing major changes, driven by customers frustrated by what they consider to be slow and incremental advances from the main automation OEMs in the industry.
US liquefaction projects to drive global expansion of LNG trade
Hydrocarbon Processing spoke to Andrew Slaughter, executive director for the Deloitte Center for Energy Solutions, about the state of the LNG industry and how trade patterns and project slates could change in the upcoming years.
China’s ‘energy revolution’ strives for sustainable growth
China's energy demand, particularly for petroleum and other liquids, is rapidly increasing as its industrial and transportation infrastructures expand.
Better risk-management methods ensure project success
Management of project risk is a challenge under normal times, and this crucial activity is exasperated in complex projects as a result of the shale gas revolution.
HP Engineering Case Histories: Case 85: Learnings on hydraulically fitted hubs
Hubs connect one piece of machinery to another, usually with some flexible coupling between them. Installers have only limited time to work with the hot hub. When incorrectly positioned, it may have to be removed, which has the potential of damaging the shaft end.
HP Global: Investment in Egypt’s downstream on the rise
Egypt is adopting a mix of investment strategies in refinery upgrades and construction of new capacity to meet the nation’s target for more high-quality light and middle distillate products and a reduction of transportation fuel imports.
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12

