Process Control
An online sulfur monitoring system can improve process balance sheets
A Canadian gas processor used this technology to meet environmental regulations
Multivariable predictive control without step testing
Other benefits of this BP project included increased production and reduced energy consumption and emissions
HP Control: Audit your APC applications
I was one of the first control industry whistleblowers, pointing out that half of the advanced process control (APC) applications implemented over the years do not work. We APC engineers have the resp..
HP Control: Jim Ford's views on advanced process control
C. F. Picou Associates, Inc. (CFPA), an affiliate of Maverick Technologies, was founded in 1974 by Dr. Courtney Picou. Originally aiming to provide process engineering consulting to the refining indus..
Controlling hydrocracker reactor temperature
Avoid safety incidents and runaway reactions
Faster plant testing and modeling
Automated technology performs both open-loop and closed-loop testing simultaneously
Set vapor velocity setpoints profitably
Use Clifftent principles to account for operating limit tradeoffs and risk to substantially improve financial performance
Dynamic real-time optimization increases ethylene plant profits
This project resulted in a $12.5 million/yr profit increase and one-month payback
Fieldbus enables single-loop integrity with control-in-the-field
Benefits include device and process health monitoring that enable establishing asset management and predictive maintenance practices
Determining plant equipment performance during transient conditions
Steady-state performance algorithms can be modified to improve accuracy
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12