Matzopoulos, M.
Improve engineering via whole-plant design optimization
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Catalysts
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
New simulation methods identify cost-effective advantages early
Consider new analysis for flares
Applying dynamic models in designing safety systems can reduce capital costs
Enhanced methods optimize ownership costs for catalysts
Novel model-based innovation techniques enable simultaneous optimization of catalyst formulations and operating reactors
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Purem by Eberspaecher develops new direct air capture technology 9/18
- Aker-Nscale JV signs multi-billion dollar AI infrastructure agreement with Microsoft 9/18
- Tracerco spearheads tracer technology in first U.S. carbon capture and storage (CCS) project 9/18
- Russia’s Novatek redirects gas condensate to Novorossiisk after Ust-Luga complex shutdown 9/18
- HyOrc and Start Lda form JV to launch national green methanol platform in Portugal 9/18
- Fatal accident at Mongstad refinery 9/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction