Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Middle East

Case history: Failure analysis of a syngas compressor

SABIC Technology Centre: van Zyl, G.  |  Al-Zahrani, E.  |  Al-Meshari, A.  |  Al-Haroon, M.

A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..

Improve pressure drop calculations for saturated water lines

When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..

World’s largest GTL facility turns to LIMS for enhanced operations

Thermo Fisher Scientific: Thurston, C.

Pearl GTL is using a new laboratory information management system (LIMS) to manage, analyze and integrate data that keeps the plant functioning securely and efficiently.

HP Reliability: Four-stage, low-flow process centrifugal compressor can fill important industry gaps

Hydrocarbon Processing Staff: Bloch, Heinz P.

In the 1970s and 1980s, multistage centrifugal compressors in the 3,000 acfm (about 5,000m3/hr) and lower flow ranges were largely confined to instrument and plant air duties. Three stages with interc..

HP Integration Strategies: Consider procedural automation at a commercial-scale pilot plant

ARC Advisory Group: Miller, Paul

“All processes are batch processes to some degree. Even in ‘continuous’ process plants, processing units will need to be shut down at some point and then restarted to resume production...

HP Boxscore Construction Analysis: Outlook for major revamp projects—Part 2

Hydrocarbon Processing Staff: Nichols, Lee

Worldwide, refiners are investing billions in upgrading and modernizing projects. These efforts are focused on:Increasing flexibility to process heavier, sourer crudesImproving energy efficiencyMeetin..

HP Engineering Case Histories: Case 74: How to determine impact forces when troubleshooting

Consulting Engineer: Sofronas, A.

When troubleshooting failures, it is not unusual for the metallurgical report to indicate that the failure was the result of an impact type of force. The investigator who receives this information mus..

HP Industry Perspectives: US oil and gas executives energized for the year ahead

Hydrocarbon Processing Staff: Romanow, Stephany

A recent survey of US executives by the KPMG Global Energy Institute supports growing optimism in the domestic energy and manufacturing industries. Much of the renewed enthusiasm is strongly linked to..

Kazakhstan to upgrade, expand Pavlodar refinery

The project will boost processing capacity to 7 million metric tpy of oil, up from 5 million tpy now. The works are slated for completion in 2018. Built in 1978, Pavlodar is the largest oil refinery in Kazakhstan.

Technip, ExxonMobil to license cumene technology for Saudi Rabigh project

Technip and ExxonMobil Chemical were awarded a contract to provide proprietary technology for a 384,000 tpy cumene plant as part of the Rabigh phase two project in Saudi Arabia. The contract includes technology license, engineering, training and start-up services for the cumene plant.